Fire Sprinkler Inspection Checklist

A printable fire sprinkler inspection checklist: gauges, control valves, heads, fire department connection and alarms. Edit it, print or save as PDF.

How to use

Step 1 Pick a template

Want to customise this checklist or mix trades? Use the custom builder

Step 2 Add your details (optional)

Your business
Logo

Saved on this device only, never uploaded.

Job

Step 3 Edit the checklist

Step 4 Print or save as PDF

More checklists

Make your own checklist

How to use

  1. The fire sprinkler template is already loaded, with weekly / monthly, quarterly and annual sections and Pass / Fail / N/A boxes.
  2. Add your business name, logo and the job details, or leave them blank to fill in by hand.
  3. Edit, add, remove or move items and sections. The preview updates as you type.
  4. Press Print, or Save as PDF and choose “Save as PDF” in the print window.
  5. Save a draft to reuse the same checklist on your next job.

Back to top ↑

About this fire sprinkler inspection checklist

Use it to record routine sprinkler system checks between contractor visits: gauge readings, valve positions, heads and clearance, the fire department connection (FDC) and waterflow alarms. Pair it with the fire alarm inspection checklist.

Follow your local code and manufacturer instructions; this is a general checklist.

Questions

How often should fire sprinklers be inspected?

NFPA 25, as adopted locally, sets weekly, monthly, quarterly, annual and longer intervals depending on the component and system type. Your authority having jurisdiction (AHJ) and insurer decide what applies to your building.

Is this an NFPA 25 inspection form?

No. It is an educational checklist for owners and maintenance staff. Inspections, tests and maintenance required by NFPA 25 should be done by qualified personnel and recorded on the form your AHJ accepts.

What should I do before a waterflow test?

Call the monitoring company and put the system on test, tell occupants, and make sure the drain discharge is safe. Call again afterward and confirm the panel is back to normal.