Generator Maintenance Checklist (Printable PDF)

A printable standby generator maintenance checklist you can save as a PDF: engine, electrical, run test and enclosure, with lines for voltage, frequency and hour meter readings.

How to use

Step 1 Pick a template

Want to customize this checklist or mix trades? Use the custom builder

Step 2 Add your details (optional)

Your business
Logo

Saved on this device only, never uploaded.

Job

Step 3 Edit the checklist

Step 4 Print or save as PDF

More checklists

Make your own checklist

How to use

  1. The generator template is already loaded, with engine, electrical, run test and enclosure sections.
  2. Add your business name, logo and the job details, or leave them blank to fill in by hand.
  3. Edit, add, remove or move items and sections. The preview updates as you type.
  4. Press Print, or Save as PDF and choose “Save as PDF” in the print window.
  5. Save a draft to reuse the same checklist on your next job.

Back to top ↑

About this generator maintenance checklist

Made for standby generator service visits: engine fluids and filters, battery and charger, transfer switch test and a run test with voltage, frequency and hour meter readings.

Getting a PDF copy

Fill in the job details and your business name first. Then press Save as PDF. Your browser opens its print window, and you pick “Save as PDF” as the printer. The paper setting switches between US Letter and A4, and the check boxes can read OK / Needs attention / N/A, Pass / Fail / N/A, Yes / No / N/A or Done / N/A. Your business details and logo are saved on your own device only.

What's on the sheet

21 lines in four sections. Engine covers oil and filter, coolant, belts and hoses, the air filter, fuel level and quality, leaks and the block heater. Electrical covers battery voltage and terminals, the charger, wiring, the control panel (no alarms, set to AUTO) and a transfer switch test. The run test asks for a prompt start, output voltage and frequency, time and load, the exhaust, noise and vibration, and the hour meter. Enclosure covers vents and louvers, pest damage and clearances.

Using it as a maintenance plan

Print one sheet per visit and keep them in date order with the unit. For the rest of the building, the preventive maintenance checklist covers general equipment. The service intervals come from the owner's manual, so copy them into the notes. Write the hour meter reading every time. That way you can see when the next hours-based service is due without guessing. If a line keeps getting marked “Needs attention” visit after visit, that's the part to quote a repair on.

Commercial and emergency generators

Some generators feed an emergency power supply system covered by NFPA 110. That standard sets its own routine: the system is inspected weekly and exercised under load at least monthly. Check with your local authority having jurisdiction for the exact requirements that apply to your system.

A starting point, not a code or manufacturer requirement. Follow the equipment manufacturer, your local authority having jurisdiction, and the current NFPA/OSHA text that applies to you.

Questions

What should be checked on a standby generator?

Fluid levels and leaks, belts and hoses, air filter, fuel, battery and charger, control panel set to AUTO, transfer switch operation, and a run test with voltage, frequency and hours recorded.

How often should a standby generator be exercised?

Follow the owner's manual for a standby unit. Emergency power systems covered by NFPA 110 are inspected weekly and exercised under load at least monthly. Check with your local authority for the exact requirements.

Does this work for portable generators?

Yes. Remove the transfer switch, block heater and enclosure items and add any items from the owner manual.