Preventive maintenance schedule template (and how to fill it in)

A preventive maintenance schedule template is a table with one row for each task on each piece of equipment. Each row says what the asset is and where it sits, what the task is, how often it is due, where that interval came from, when it was last done, when it is next due, and who does it. Fill the intervals in from the equipment manual first. Then add any minimum a code sets, plus whatever the insurer or the service agreement asks for. Sort by the next-due date and you have your work list for the month.

That's the whole idea. The rest of this guide covers each column, a sample filled in from published sources, and how to get from the schedule to a printed sheet the tech can tick off on site.

A starting point, not a code or manufacturer requirement. The equipment manufacturer, your local authority and the current text of any rule that applies to you come first.

Plan features change, so check Jobber's own pricing page before you pick a tier. Its pricing page lists automated client reminders on the plans above Core.

The columns

Keep it to columns you will actually fill in. These are the ones that earn their place:

PM schedule template columns
ColumnWhat goes in it
Asset and IDThe equipment name plus a tag or serial number, so two identical units can't get mixed up.
LocationThe building plus the room or roof area. The tech needs to find it without asking.
TaskOne task per row, written the way it appears on the visit sheet.
FrequencyA calendar interval such as monthly, or an hours figure for equipment with a run-hour meter.
Interval sourceThe manual, a code section, or whoever asked for it (insurer or service agreement). Most templates leave this column out.
Last doneThe date of the last completed visit for that task.
Next dueLast done plus the frequency. In a spreadsheet this can be a formula.
Done byIn-house staff, your company, or an outside specialist.
NotesFilter sizes, belt numbers, access codes, anything that saves a trip back to the van.

Where each interval should come from

The frequency column is where schedules go wrong. Someone copies "quarterly" from a generic list, and nobody can say later why it's quarterly. Writing the source next to every interval fixes that.

Start with the manufacturer's manual for each asset. It is written for that exact unit, so copy its intervals in first. Then check whether a rule sets a minimum for that equipment. Fire extinguishers in a workplace are the clearest example, covered below. After that, add anything the building's insurer or your service agreement with the customer asks for. When two sources disagree, schedule the more frequent one and note both.

Your own records count too. If a condenser coil is filthy at every quarterly visit, the site needs it more often than the manual suggests, and the old sheets are the evidence.

A sample schedule filled in from published sources

Every interval below comes from the source named in the row. Replace the asset names and dates with your own.

Sample preventive maintenance schedule
AssetTaskFrequencyInterval source
Portable fire extinguishersVisual inspectionMonthlyOSHA 29 CFR 1910.157(e)(2)
Portable fire extinguishersMaintenance check, date recordedYearlyOSHA 29 CFR 1910.157(e)(3)
Stored-pressure dry chemical extinguishers that need a 12-year hydrostatic testEmptied and given the applicable maintenanceEvery 6 yearsOSHA 29 CFR 1910.157(e)(4)
Central AC, furnace or heat pumpInspect, clean or change the air filterMonthlyENERGY STAR maintenance checklist
Cooling systemPre-season check-upYearly, in springENERGY STAR maintenance checklist
Heating systemPre-season check-upYearly, in fallENERGY STAR maintenance checklist
Emergency generator on an NFPA 110 systemInspectWeeklyNFPA 110
Emergency generator on an NFPA 110 systemExercise under loadAt least monthlyNFPA 110
Commercial refrigeration systemFull PM with readingsPer manual or service agreementManufacturer and service agreement

The extinguisher rows come from OSHA 1910.157, which applies to extinguishers provided for employees to use. It also says the annual maintenance date must be recorded and kept for one year after the last entry or the life of the shell, whichever is less. The HVAC rows come from ENERGY STAR's maintenance checklist, which is written for homes, so treat it as a floor for light commercial equipment and let the manual decide the rest. NFPA 110 covers emergency power supply systems. Your local authority having jurisdiction decides exactly what applies to a given generator.

The refrigeration row is left open on purpose. There is no single published interval for every system, and kitchens with grease in the air need more than a clean storeroom does.

Calendar time or run hours

Most rows run on the calendar. Some equipment is serviced by hours instead, and generators are the usual case. For those, put the hours figure in the frequency column and write the meter reading on every visit sheet. When the reading gets close to the next service, move that row up the list. Our generator maintenance checklist has a line for the hour meter for this reason.

Turning the schedule into visits

At the start of each month, filter the schedule for anything due that month and group the rows by site. Each group becomes a visit. Then print the sheet that matches the work:

When the signed sheet comes back, update the last-done date for each row it covers. The next-due date moves forward, and the row drops off this month's list. Anything marked as needing attention goes in the notes column so it gets quoted rather than forgotten.

Keep the sheets

The schedule tells you what should have happened. The filled-in sheets show what did. Keep them in date order for each asset. They answer the warranty question, the insurer's question and the customer's "when did you last look at this?" with a date and a signature.

Questions

What should a preventive maintenance schedule template include?

One row per task per asset, with the asset and its ID, location, task, frequency, where the interval came from, last done, next due, who does it, and notes.

What is the difference between a PM schedule and a PM checklist?

The schedule says when each task is due across all your equipment. The checklist is the sheet the tech fills in on the day, with a line for each task and blanks for readings.

Should I use one schedule or separate monthly, quarterly and yearly ones?

One schedule with a frequency column is easier to keep current. Filter it by next-due date to get each month's list, then print the matching visit sheet.

How do I set the right interval for each task?

Use the manufacturer's manual first, then add any requirement from a code. Insurers and service agreements can add more. If two sources disagree, use the more frequent interval and write both in the source column.